ISO

9001

CERTIFIED

ISO

14001

CERTIFIED

FOR ENQUIRIES CALL US AT

01656 724716

New Liebherr LH35 excavator at B&W Tunnelling yard

SINCE 1985 // 40+ YEARS UNDERGROUND

Our Story

From traditional hand excavation to one of the UK’s largest mechanised pipejacking fleets — four decades of specialist trenchless engineering.

B&W Tunnelling site operative on hydraulic jacking frame during shaft operations

Who We Are

Since being established in 1985, B&W Tunnelling has established itself across the UK and Ireland as a leading specialist trenchless & shaft contractor.

A family grown South Wales business that has quietly engineered some of the nation’s most demanding underground infrastructure, from deep sewer tunnels beneath city streets to record-breaking pipejacks under active railways.

Four Decades Underground

Milestones That Shaped B&W Tunnelling

From hand-dug tunnels in 1985 to a mechanised fleet servicing the UK and Ireland — here’s how we got here.

    Hand excavation tunnel shield in a segmental shaft

    Traditional techniques, 900–2400mm diameter.

    01 / 04

    Hand Excavation Era

    In the early years B&W Tunnelling’s reputation was built on vast experience of traditional hand-excavation techniques, constructing tunnels from 900mm to 2400mm diameter.

    Stepping into the 21st Century

    Plant investment and mechanised crews.

    02 / 04

    Stepping into the 21st Century

    In 1999 B&W Tunnelling stepped into the 21st century and became mechanised, transforming how we approached every scheme, every ground condition, every diameter.

    55m in a 12-hour shift

    St Brides // Dwr Cymru Welsh Water // 1500mm TBM.

    03 / 04

    55m in a 12-hour shift

    Working on the Dwr Cymru Welsh Water scheme at St Brides in 2002, B&W Tunnelling set a World Record for 1500mm TBM — pipejacking 55 metres in a single 12-hour shift. By 2002 the company owned one of the largest mechanised pipejacking fleets in the UK.

    A full trenchless arsenal

    Microtunnelling — the newest addition.

    04 / 04

    A full trenchless arsenal

    We continue to invest in new equipment, having recently added microtunnelling to our arsenal. B&W Tunnelling offers clients a wide range of trenchless techniques to suit every scheme, requirement and ground condition.

By the Numbers

Where We Are Today

40+

YEARS TRADING

Established October 1985

55m

WORLD RECORD

Pipejacked in a 12-hour shift

UK&IRE

COVERAGE

Nationwide specialist operation

#1

FLEET

One of UK’s largest pipejacking fleets

A Full Trenchless Arsenal

A Wide Range of Techniques to Suit Any Ground

Every site brings its own challenges. Our investment in machinery and decades of ground-condition experience means we bring the right technique — and the right team — to every scheme.

Active B&W Tunnelling site — aerial view

“We invest in the plant, the people and the ground knowledge to solve problems other contractors walk away from.”

Ready When You Are

Let’s Talk About Your Scheme

Do please contact us — we’re happy to discuss your scheme and the potential trenchless solutions that suit your requirements and ground conditions.